Commercial Architecture - 08
Commercial Architecture page: [prev] | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 |
09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | [next]
 |
MOSHE SAFDIE BUILDS FOR PEACE
From the intersection of 23rd Street and Constitution Avenue in Washington, D.C., at a corner of the U.S. National Mall near the Potomac River, the grandeur of the Lincoln Memorial is due south, and war-related memorials to Vietnam veterans, World War II, and George Washington, among others, unfold to the left, southeastward. Published 2011.1109
 |
 |
NEW WOOD WORK
Within these plantations of God, a decorum and sanctity reign, a perennial festival is dressed, and the guest sees not how he should tire of them in a thousand years. In the woods, we return to reason and faith. There I feel that nothing can befall me in life,— no disgrace, no calamity, (leaving me my eyes,) which nature cannot repair. Standing on the bare ground,— my head bathed by the blithe air, and uplifted into infinite space,— all mean egotism vanishes. I become a transparent eye-ball; I am nothing; I see all; the currents of the Universal Being circulate through me; I am part or particle of God. Published 2011.1102
 |
 |
AMERICAN LANDSCAPE AWARDS
When it originally opened in 1978, the Portland Transit Mall created a transit-focused corridor in downtown Portland, Oregon. For a distance of 11 blocks through the commercial core, a pair of one-way streets combined dedicated bus lanes and limited car traffic with wide brick sidewalks and an abundance of trees, benches, and shelters. But despite being an icon for progressive urban planning, the mall suffered deferred maintenance and deterioration over time. Published 2011.1102
 |
 |
UIA WORLD CONGRESS 2011
There were fears that the great earthquake that struck eastern Japan in March 2011 would in some way lessen the UIA World Congress recently held in Tokyo by the International Union of Architects (UIA). Published 2011.1026
 |
 |
SOLAR DECATHLON 2011
In the U.S. Department of Energy's recent Solar Decathlon, architecture and engineering students competed to build the most efficient, innovative, economical, and attractive home powered by the sun. Published 2011.1012
 |
 |
LEED FOR EXISTING BUILDINGS
The Empire State Building made headlines recently for achieving LEED Gold certification following a major green retrofit project that will reduce the skyscraper's energy consumption by more than 38 percent. The building's electric chiller plant was rebuilt, electric meters were installed at the tenant level, and all 6,514 window units were removed, refurbished to improve their energy efficiency, and reinstalled. Published 2011.1012
 |
 |
2011 STIRLING PRIZE SHORTLIST
The Stirling Prize for 2011 goes to Evelyn Grace Academy by Zaha Hadid Architects, chosen from a shortlist of six outstanding projects. In this article, ArchitectureWeek documents the five outstanding projects that were shortlisted but didn't get the Stirling Prize, with commentary from the RIBA jury.
Project Velodrome Published 2011.1005
 |
 |
HADID - STIRLING PRIZE FOR EVELYN GRACE ACADEMY
For the second year in a row, the top British architecture prize has been awarded to a building designed by Zaha Hadid.
The Evelyn Grace Academy in the south London district of Brixton has received the Stirling Prize for 2011 from the Royal Institute of British Architects (RIBA). Published 2011.1005
 |
 |
STANLEY TIGERMAN: ARCHITECT AS CHAMELEON
A bedrock belief in the classic theology of modern architecture was that architects always had to be original. Architects were to create a new built world that divested itself from the past, from classical architecture and its decoration, and invent brand-new, innovative buildings. In many ways, for a modern architectural designer, being original could be more important than being good. Published 2011.1005
 |
 |
TUNING A BUILDING AT KIERANTIMBERLAKE
At KieranTimberlake, we frequently conduct postoccupancy building monitoring to verify the performance of our buildings. Preproject monitoring services are used to diagnose and treat existing buildings.
A monitoring program preceded renovation work at Yale University's Sage Bowers Hall, a 1920s-era classroom and office building. The study compared existing uninsulated construction with mock-ups that added new insulation and energy-efficient window assemblies. Published 2011.0928
 |
Commercial Architecture page: [prev] | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 |
09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | [next]
|
|