Page D3.2 . 20 September 2000                     
ArchitectureWeek - Design Department
NEWS   |   DESIGN   |   BUILDING   |   DESIGN TOOLS   |   BUILDING CULTURE
DESIGN
 
  •  
  • Fashion Meets Food at the Brasserie 8-1/2
     
  •  
  • Illuminating Foster
     
  •  
  • New Museum Celebrates the American Fleet

     
    AND MORE
      Current Contents
      Blog Center
      Book Center
      Download Center
      New Products
      Classic Home
      Calendar
      Competitions
      Conferences
      Events & Exhibits
      Architecture Forum
      Architects Directory
      Library & Archive
      Web Directory
      Jobs & Marketplace
      About ArchWeek
      Search
      Subscribe & Contribute
      Newsletter Free
       

     
    QUIZ

    New Museum Celebrates the American Fleet

    (continued)

    The exterior cladding of the building is an aluminum composite panel by Alucobond, chosen for its economy, clean appearance, and durability against the brackish environmental conditions.

    Plaza Construction Corporation faced several unusual challenges. Situated on the forward bulkhead portion of Pier 86, the building required substantial structural additions for the foundation. To complicate matters, all utilities that serve the entire museum facility originate at the visitor center location yet had to be maintained throughout construction.

    Construction was completed on June 31, 2000, in time for events centered around the Independence Day weekend. Events at the museum included Operation Sail 2000, Military Salute Week, and the International Naval Review, which saw over 100,000 people at the Intrepid.

    By the end of 2001, the visitor center will provide the western touch-down point for a new pedestrian bridge that will cross 12th Avenue as a focus of the Hudson River Park plan, currently under construction.

    Suk Design Group, which developed the master plan for the Intrepid Museum, is also designing a 245-person theater, newly expanded dining facilities, and updated interactive exhibits.

     
    Project Credits

    Client: Intrepid Sea Air Space Museum
    Architect: Suk Design Group LLP
    Construction Manager: Plaza Construction Corporation
    Structural Engineer: Office of Structural Design
    Mechanical, Electrical, and Plumbing Engineer: Marino Gerazounis & Jaffe Associates, Inc.

    AW

    ArchWeek Photo

    Entrance to the newly opened Intrepid Sea Air Space Museum.
    Photo: Holly Carson, Suk Design Group

    ArchWeek Photo

    Computer rendering of the ticket office and atrium of the new visitor center.
    Image: Suk Design Group

    ArchWeek Photo

    An exterior view, rendered on a computer during design shows the canopies on either end of the new visitor center, indicating entry and exit points.
    Image: Suk Design Group

    ArchWeek Photo

    The fast-paced construction had barely begun in January, 2000.
    Photo: Holly Carson, Suk Design Group

    ArchWeek Photo

    Progress in construction by March.
    Photo: Holly Carson, Suk Design Group

    ArchWeek Photo

    Construction nearing completion in May.
    Photo: Holly Carson, Suk Design Group

    ArchWeek Photo

    During construction, the metal gussets at the roof's edge preview the shape of the parapet profile.
    Photo: Holly Carson, Suk Design Group

    ArchWeek Photo

    The staircase will also be used for 24-hour access to the future pedestrian bridge over the West Side Highway.
    Photo: Holly Carson, Suk Design Group

     

    Click on thumbnail images
    to view full-size pictures.

     
    < Prev Page Next Page > Send this to a friend       Subscribe       Contribute       Advertise       Privacy       Comments
    GREAT BUILDINGS   |   DISCUSSION   |   SCRAPBOOK   |   COMMUNITY   |   BOOKS   |   FREE 3D   |   ARTIFICE   |   SEARCH
      ArchitectureWeek.com © 2000 Artifice, Inc. - All Rights Reserved